How to finance solar panels on a farm?
Electricity for farms in Greater Poland has become 22.4% more expensive in the last year, which directly hits the profitability of production. At Meridian Greater Poland, since September 2017, we have been helping farmers switch to their own energy sources without drowning all their savings in investment. The 'Energy for the Village' program is currently the most concrete way to free solar electricity.
Why is 47.3% a magic number in your budget?
Most farmers around Śrem or Września have heard about subsidies, but few know exactly how much ends up in the account. As part of the 'Energy for the Village' program, you can count on a refund of up to 47.3% of the eligible costs of a photovoltaic installation with a capacity of up to 50 kW. If your installation costs, for example, 167,400 PLN net, you will realistically recover over 79,180 PLN. These are not promises without coverage – since the beginning of 2024, we have already settled 38 such applications for farms with a breeding profile.
We know the land and the numbers, so we know that the payback time counts. At current energy prices and obtaining a subsidy, the investment pays off in an average of 3.8 years. The rest is pure profit that stays in the pocket for fertilizers or fuel. We watch the deadlines for you, because intakes have their rigid frames, and NFOŚiGW does not forgive being late even by one hour. Our team in Poznań analyzes each project in terms of actual electricity consumption so that the installation is neither too small nor oversized.
Investment in panels with a 47.3% subsidy pays off in 3.8 years. The rest is pure profit for your farm.

Work schedule: from application to the first kilowatt-hour
We usually close the entire process in 14 months, although the installation itself lasts only 3-5 business days. Bureaucracy takes the most time, which we take upon ourselves. Preparing a correct application takes our specialists an average of 34 hours of work on technical and financial documentation. We must include an energy audit, which will show officials in black and white that the panels will actually reduce emissions and costs on your farm.
After submitting the documents, we wait for the decision on granting funds. In 2023, the average waiting time in our region was 164 days. Once we have the green light, the assembly team enters. We cooperate with 7 proven installers from Greater Poland who do not leave a mess in the yard. After assembly, the last stage remains: an application for payment and an inspection that confirms that everything is working as planned. You get facts, not promises – we lead you by the hand through each of these steps.

Energy storage – is it worth paying extra for batteries?
You often ask whether to add energy storage to the panels. The answer is: it depends on when you consume the most electricity. If you have a dairy that works in the morning and evening, a battery with a capacity of 15-20 kWh can increase your self-consumption by 31.5%. The 'Energy for the Village' program promotes such solutions with a higher level of funding. This makes the total cost of the system with batteries only 14.8% higher than the photovoltaics alone, and independence from the grid grows rapidly.
At Meridian Greater Poland, we don't talk you into expensive gadgets if they are not justified in the farm's daily cycle. We analyze the invoices from the last 11 months and check the power consumption peaks. Sometimes the better way is a smaller installation without storage, but with a better energy management system. We respect your wallet, so every recommendation is backed by calculations, not by marketing slogans. P.S. Remember that energy storage requires a special, ventilated place, which is worth planning already at the project stage.
Energy storage increases independence by 31.5%. We check the invoices to see if it pays off for you.

How to avoid rejection of the application due to errors in metatags?
Officials reject about 19% of applications for formal reasons, such as a lack of an up-to-date extract from the land registry or errors in plot numbers. We have eliminated these risks to the level of 1.2% in our projects. We check the legal status of roofs – if the building is not approved for use or has an unclear ownership situation, the subsidy will be lost. Before we sign the contract, we do a quick review of your documents so as not to waste your time on projects doomed to failure.
Heads-up: many people forget about insurance for the installation, which is a requirement for EU subsidies. The cost of a policy for a medium-sized system is about 340-480 PLN per year, and it protects you against hailstorms or surges after a storm. At Meridian Greater Poland, we watch such details, because the devil is in the details. If you want to find out if your buildings are suitable for assembly, we will prepare a preliminary technical opinion for you within 48 hours of the report.